Testimonials

Complete refurbishment of an existing under-build including the removal of load bearing walls, the building of new walls, a new kitchen area, a new shower room and a bedroom with 40m2 of tiling. Duration, five weeks.

‘’A great job done with more than one problem. All solved. The shower room especially is really nice.’’

Andy and Karen, Quesada

Demolition and removal of six metres of balustrades, bottoms and tops. Replacement of same matching the existing. Duration, three days.

‘’Thanks guys a great job, looking good. I will have no problem in recommending SNP Refurb for more work in the future on our Community.’’

Brian and Diane, Quesada

Building an outside planter, lined with polythene and with a finished top. Tiling eighteen steps to their roof terrace. Duration, six days.

‘’Good work you two. Stairs are looking especially good. No more broken steps!’’

Diane and Brian, Quesada

Turning an open plan kitchen/lounge into a separate kitchen with an archway entrance door and an archway serving hatch. Using metal stud wall, plasterboard, rodapia and granite to match existing. Duration four days.

‘’Thanks Stan and Paul, the wife is happy so I am delighted!

Peter and Libby, Benimar

Design and build of an outside kitchen and installing of a new inside kitchen in an under-build. Please see Before and after pictures. Duration, Three weeks.

‘’Brilliant outside kitchen! Used it a lot this summer. Under-build kitchen so much better than the old one.’’

Eric, Benimar II

Design and build of an outside kitchen on his roof terrace. Two weeks.

‘’Can’t thank you enough for making bringing my roof terrace to life. Now my favourite place to be.’’

Stephen Gilbert, Quesada

Refurbishment of an existing but unused under-build. Removal of a suspended ceiling and wallboards. Creation of two bedrooms both with en-suite walk in shower rooms and a lounge with a new kitchen. Work included four new doors and frames, a Macerator in one of the shower rooms and 30 m2 of tiling. Duration, six weeks.

‘’Fantastic work! We now have room for our relatives to visit us in nice surroundings. Five Star Plus.’’

Peter and Libby, Benimar

Painting all of the outside of a Blue Top in white and yellow to match existing including all external walls. Installing rainwater guttering to allow water to drain away safely.  Duration, ten days.

‘’Wonderful job. Thanks. The place looks great now.’’

Leah and Alan, Quesada

Removal of a bath, replacing it with a walk in shower tray 25 mm thick. New sink, with cabinet and mirror. Retiling floor. Duration, seven days.

‘’Looks great. All done when we were back in Scotland. No mess, very clean and tidy job.’’

Tony and May, Quesada

Building up existing walls to allow privacy at the front, two sides and the rear of their property. Render finish except for the front which was tiled. Duration, five days.

‘’Looking good guys. Nice to have some privacy from people walking past on the pavement. The new gates will look fantastic.’’

Peter and Libby, Benimar

Restoring rented premises in Quesada which was a laundry to its original rentable state. Helping to re-locate the laundry to Benimar including pipework, shelving etc.

Blair and Ann, Quesada and Benimar

Building a large made to measure car port from heavy timbers. Rejuvenating a sad old BBQ area and creating new plant boxes from wood left over from the car port. Duration, seven days.

‘’Fantastic BBQ and all your other work done very well. Thanks.’’

Jo and Dave, Quesada

Complete renovation of a water damaged under-build. Including, taking all internal walls back to the original brick walls. Skimming these walls with waterproof coating. Gotalaying all new walls and painting same.

Removal of two wardrobes and two large storage cupboards. Complete reconstruction of these using 40 x 40 framing, cladding with white boards and creating shelves and hanging areas with shelf units. Complete with new modern sliding doors.

Totally retiling a bathroom and shower room, complete with new WC’s, sinks with base units and mirrors, walk in shower tray 25 mm thick, new remote shower, shower screen and lit area for shampoo etc.

Installing four new doors and a new IKEA kitchen with ten base units and four wall units with washing machine, sink, hob and oven, extractor all associated plumbing and electrical work.

Outside, tiling 28 steps, eighteen to roof terrace, five at the front and five at the rear and tiling 50m2 of terrace in matching tiles.

Removing one hundred and twenty balustrades with concrete bottoms and curved tops. Replacing same with stainless steel posts and glass balustrades. Duration, fifteen weeks.

Karen Cremins and Colin Daly, Quesada

Demolition of an existing wall and stand alone BBQ. Saving BBQ to build into new outside kitchen. 

Constructing a five metre long outside kitchen, including incorporating the existing BBQ and adding a flat plancha and a pizza oven. Also including three white aluminium double cupboard doors. Please see Before and after pictures.

‘’Stan and Paul built an outside kitchen and BBQ for us. They advised us on the design and practicality of the project and were very professional in their work. We were completely happy with the results and more than pleased to recommend them to anyone looking for building work.’’

Brian and Ann, Montebello